top of page
20220106_124843-2.jpg

Milwaukee Riverwalk

Pierce Engineers served as structural engineer for the Milwaukee Riverwalk between Clybourn Avenue and Highland Avenue over the period from 2006 to 2015. This involved on-grade pedestrian ramps, pile-supported pedestrian lifts, and pile-supported precast stretches of walkway. The intent of each project was to make a given stretch of the Riverwalk ADA accessible. The work occurred on at least one, and sometimes both sides of the River at each cross street between Clybourn and Highland.

bottom of page